{"id":38623,"date":"2026-11-20T16:30:38","date_gmt":"2026-11-20T15:30:38","guid":{"rendered":"https:\/\/jle.de\/?page_id=38623"},"modified":"2026-11-20T16:30:54","modified_gmt":"2026-11-20T15:30:54","slug":"project-management-construction-process-mallorca","status":"publish","type":"page","link":"https:\/\/jle.de\/en\/project-management-construction-process-mallorca\/","title":{"rendered":"Project Management, Construction Process and Responsibilities in Mallorca"},"content":{"rendered":"<h1 style=\"text-align: center;\"><strong>Project Management, Construction Process and Responsibilities in Mallorca<\/strong><\/h1>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/ChatGPT-Image-2-may-2026-21_26_18.png\" alt=\"project management and construction process in Mallorca\" width=\"170\" height=\"113\" \/><\/p>\n<h3 style=\"text-align: center;\">Responsibilities and structure<\/h3>\n<p style=\"text-align: center;\">A building project is never just design and execution. It is always also a process of decisions, coordination, deadlines, budgets and responsibilities. That is exactly why project management in Mallorca is so often underestimated \u2013 although in practice it decides between calm and friction.<\/p>\n<p style=\"text-align: center;\">The higher the standard, the more important the management. Many Mallorca projects are run from abroad. Without clear responsibilities, a project loses calm, direction and quality. (<a href=\"https:\/\/www.caib.es\/pidip2front\/jsp\/es\/ficha-convocatoria\/el-govern-se-reune-con-los-ayuntamientos-en-la-felib-para-informar-sobre-la-implantacion-de-las-entidades-colaboradoras-urbanisticas\" target=\"_blank\" rel=\"noopener\">Web GOIB<\/a>). That is why jle combines architecture with on-site project management.<\/p>\n<h4 style=\"text-align: center;\">Who has which role in the project<\/h4>\n<p style=\"text-align: center;\">The architect develops the design. The lawyer checks ownership, contracts and legal position. The tax adviser classifies structure and tax consequences. A project manager or client representative keeps deadlines, costs, interfaces and decision paths together.<\/p>\n<h4 style=\"text-align: center;\">Why clear responsibilities matter so much<\/h4>\n<p style=\"text-align: center;\">Many problems do not arise because nobody is responsible, but because several parties understand different things by responsibility. The earlier roles and communication paths are defined cleanly, the lower the risk of idle time and misunderstandings.<\/p>\n<h4 style=\"text-align: center;\">Project management matters above all for clients<\/h4>\n<p style=\"text-align: center;\">International owners in particular benefit when someone structures the project in the client\u2019s interest and does not merely handle individual specialist services. This is especially valuable when owners are not permanently on site. jle therefore offers architecture and project management as one integrated service.<\/p>\n<p style=\"text-align: center;\">The LOE expressly organises the roles in the Spanish building process. Among others, it distinguishes between promotor, project author, site management (director de obra) and technical execution management (director de ejecuci\u00f3n de obra). This separation is not a formality. It is the basis for decisions, liability and execution fitting together. (<a href=\"https:\/\/www.caib.es\/pidip2front\/jsp\/es\/ficha-convocatoria\/el-govern-se-reune-con-los-ayuntamientos-en-la-felib-para-informar-sobre-la-implantacion-de-las-entidades-colaboradoras-urbanisticas\" target=\"_blank\" rel=\"noopener\">Web GOIB<\/a>)<\/p>\n<p style=\"text-align: center;\">Since 2024 the Balearic government has additionally relied on organisational acceleration. That is precisely why the internal project structure is even more important today. Anyone who wants to use administrative simplification must organise approvals, documents and interfaces all the more cleanly. (<a href=\"https:\/\/www.caib.es\/pidip2front\/jsp\/es\/ficha-convocatoria\/el-govern-se-reune-con-los-ayuntamientos-en-la-felib-para-informar-sobre-la-implantacion-de-las-entidades-colaboradoras-urbanisticas\" target=\"_blank\" rel=\"noopener\">Web GOIB<\/a>)<\/p>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>1. Basic principle: project management is not a substitute for the statutory roles<\/strong><\/h2>\n<ul style=\"text-align: center;\">\n<li>In Mallorca the construction process is not regulated by a \u201cproject manager function\u201d but by the statutory division of tasks among the responsible parties.<\/li>\n<li>What matters is the interplay of:\n<ul style=\"text-align: center;\">\n<li>Spanish building law<\/li>\n<li>Balearic planning law<\/li>\n<li>the municipal building licence<\/li>\n<li>project documents<\/li>\n<li>works contracts<\/li>\n<li>health and safety<\/li>\n<li>subcontracting rules<\/li>\n<li>tax and payment structure<\/li>\n<\/ul>\n<\/li>\n<li>The Spanish Ley de Ordenaci\u00f3n de la Edificaci\u00f3n, LOE, distinguishes the statutory \u201cagentes de la edificaci\u00f3n\u201d: client\/promotor, designer, contractor, site manager, technical site manager, inspection bodies, suppliers, owners and users. Their duties arise from law and contract. (<a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>2. Statutory division of tasks among the main parties<\/strong><\/h2>\n<h3 style=\"text-align: center;\">Client \/ promotor<\/h3>\n<ul style=\"text-align: center;\">\n<li>decides, commissions, finances and programmes the building project<\/li>\n<li>must hold a right to build on the plot<\/li>\n<li>provides the designer with the necessary preliminary information<\/li>\n<li>must organise permits and administrative authorisations<\/li>\n<li>signs the acceptance of the works<\/li>\n<li>bears central responsibility for selection, commissioning and documentation. (<a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Rule of thumb:<\/strong><\/p>\n<p style=\"text-align: center;\">The client can delegate tasks but cannot lose overall responsibility as promotor.<\/p>\n<h3 style=\"text-align: center;\">Architect \/ arquitecto \/ proyectista \/ director de obra<\/h3>\n<ul style=\"text-align: center;\">\n<li>prepares the design and the permit-ready project<\/li>\n<li>prepares the detailed design and the execution project<\/li>\n<li>coordinates specialist design<\/li>\n<li>is responsible for the technical, design, urban-planning and environmental conformity with project, licence and contract<\/li>\n<li>gives binding technical instructions in the Libro de \u00d3rdenes y Asistencias<\/li>\n<li>checks foundations, interpretation of the project, changes, progress and the final certificate<\/li>\n<li>is not a mere \u201cdesigner\u201d but a technical lead figure defined by law. (<a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Technical architect \/ arquitecto t\u00e9cnico \/ aparejador \/ director de ejecuci\u00f3n<\/h3>\n<ul style=\"text-align: center;\">\n<li>part of the Direcci\u00f3n Facultativa<\/li>\n<li>directs the material execution<\/li>\n<li>controls the quality and quantity of the construction work<\/li>\n<li>checks materials, construction products, inspections and tests<\/li>\n<li>controls execution, setting-out (replanteo), building elements, installations and conformity with the project and the architect\u2019s instructions<\/li>\n<li>prepares or signs partial certificates, billing bases, the final account and the final certificate. (<a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Rule of thumb:<\/strong><\/p>\n<p style=\"text-align: center;\">The architect is responsible for the overarching project and design logic; the technical architect controls the concrete execution, quantities, quality and building reality.<\/p>\n<h3 style=\"text-align: center;\">Contractor \/ constructor \/ contratista<\/h3>\n<ul style=\"text-align: center;\">\n<li>undertakes by contract towards the client to carry out the works<\/li>\n<li>provides staff, materials, equipment and organisation<\/li>\n<li>must build according to project, contract, law and the instructions of the architect and the technical architect<\/li>\n<li>appoints a site manager (jefe de obra)<\/li>\n<li>is responsible for subcontractors, resources, execution and site organisation. (<a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Rule of thumb:<\/strong><\/p>\n<p style=\"text-align: center;\">The contractor is the party that executes, not a neutral inspector of their own work.<\/p>\n<h3 style=\"text-align: center;\">Health and safety coordinator \/ coordinador de seguridad y salud<\/h3>\n<ul style=\"text-align: center;\">\n<li>required when several companies, companies plus self-employed persons or several self-employed persons work on the site<\/li>\n<li>is appointed by the promotor<\/li>\n<li>coordinates safety principles, work phases, simultaneous works and site access<\/li>\n<li>approves the contractor\u2019s health and safety plan<\/li>\n<li>can stop the works or parts of them in the case of serious and imminent danger. (<a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1997-22614\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>3. Project management \u2013 useful, but delimit it cleanly in the contract<\/strong><\/h2>\n<p style=\"text-align: center;\">Project management is often very sensible for private building projects in Mallorca, but it has no authority of its own and does <strong>not<\/strong> replace, in law, the tasks of the architect, the technical architect, the lawyer or the tax adviser. If one compares the scopes of services of architects and technical architects in Spain with those customary in Germany under the HOAI, the areas of competence and responsibility are not identical but in part different. Additional project management in Spain can therefore help to balance these differences, coordinate interfaces and bundle the client\u2019s interests effectively, which is why jle offers project management as part of additional architect services.<\/p>\n<p style=\"text-align: center;\">Typical tasks:<\/p>\n<ul style=\"text-align: center;\">\n<li>client representation in day-to-day matters<\/li>\n<li>schedule, cost tracking, payment plan<\/li>\n<li>comparison of offers and tender coordination<\/li>\n<li>minutes, decision lists, change management<\/li>\n<li>control of information flows between architect, t\u00e9cnico, contractor, lawyer, tax adviser and client<\/li>\n<li>preparation of awards<\/li>\n<li>checking that invoices, variations and progress match each other<\/li>\n<li>escalation management in the case of delays, defects or contract disputes<\/li>\n<\/ul>\n<p style=\"text-align: center;\">Not its task:<\/p>\n<ul style=\"text-align: center;\">\n<li>no replacement of the Direcci\u00f3n Facultativa<\/li>\n<li>no unauthorised technical site management<\/li>\n<li>no legal contract review without a lawyer<\/li>\n<li>no tax assessment without a tax adviser<\/li>\n<li>no chain of instruction that undermines the architect or t\u00e9cnico<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>4. Why the contractor is not the best choice for project management<\/strong><\/h2>\n<ul style=\"text-align: center;\">\n<li>Conflict of interest: otherwise they control their own costs, variations, delays and defects.<\/li>\n<li>No neutral inspection body: defects, quantities and deviations must be checked independently.<\/li>\n<li>Statutory logic: the constructor executes; the architect and the technical architect give instructions and check conformity with project and quality. (<a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/li>\n<li>Variations: the contractor has an economic interest in additional services; the client needs independent review.<\/li>\n<li>Scheduling: the contractor plans from an execution perspective, not necessarily from the perspective of permits, costs, contracts and the client.<\/li>\n<li>Quality control: materials, execution, tests and certificates belong in the control of the technical management.<\/li>\n<li>Documentation: whoever builds should not alone define whether it was built and what was owed.<\/li>\n<\/ul>\n<p style=\"text-align: center;\">A contractor can organise the construction. But they should not steer it alone. Serious project management separates execution, technical control, contract control and economic client representation.<\/p>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>5. Separation of powers in the building project<\/strong><\/h2>\n<h3 style=\"text-align: center;\">Technical power<\/h3>\n<ul style=\"text-align: center;\">\n<li>architect<\/li>\n<li>technical architect<\/li>\n<li>specialist designers<\/li>\n<li>safety coordinator<\/li>\n<li>laboratories and quality inspectors<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Contractual power<\/h3>\n<ul style=\"text-align: center;\">\n<li>client<\/li>\n<li>lawyer<\/li>\n<li>project manager<\/li>\n<li>contractor<\/li>\n<li>subcontractors<\/li>\n<li>suppliers<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Economic power<\/h3>\n<ul style=\"text-align: center;\">\n<li>client<\/li>\n<li>project manager<\/li>\n<li>tax adviser<\/li>\n<li>bank<\/li>\n<li>insurance<\/li>\n<li>invoice and payment approval<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Authority power<\/h3>\n<ul style=\"text-align: center;\">\n<li>municipality \/ Ayuntamiento<\/li>\n<li>building department<\/li>\n<li>Consell de Mallorca for higher-level matters<\/li>\n<li>Govern Balear \/ CAIB for autonomous competences<\/li>\n<li>where applicable coastal, heritage, environmental, water or protected-area authorities<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>6. Interplay of architect, project management, lawyer and tax adviser<\/strong><\/h2>\n<h3 style=\"text-align: center;\">Architect<\/h3>\n<ul style=\"text-align: center;\">\n<li>makes the project permit-ready in planning-law, technical and design terms<\/li>\n<li>coordinates specialist design<\/li>\n<li>provides the technical overall direction<\/li>\n<li>checks changes in relation to permit, project and building regulations<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Project management<\/h3>\n<ul style=\"text-align: center;\">\n<li>keeps deadlines, costs, decisions and communication together<\/li>\n<li>organises tenders, bid comparisons, meetings and minutes<\/li>\n<li>creates transparency for the client<\/li>\n<li>translates technical, legal and commercial topics into decision bases<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Lawyer<\/h3>\n<ul style=\"text-align: center;\">\n<li>checks plot, land register, cadastre, building law, contamination, easements, legality<\/li>\n<li>structures building contracts, payment plans, securities, contractual penalties, liability, termination, variations<\/li>\n<li>supports licence questions, objections, neighbour issues, disputes and acceptances<\/li>\n<li>ensures that project management and building contract interlock in a legally robust way<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Tax adviser<\/h3>\n<ul style=\"text-align: center;\">\n<li>checks IVA, ITP, AJD, withholding taxes, tax residence, invoice logic and payment flows<\/li>\n<li>ensures correct taxation of construction services, acquisition, financing and own use \/ letting<\/li>\n<li>supports liquidity planning, because tax, licence fees, fees, partial invoices and guarantees must be planned together<\/li>\n<li>For construction services on residential buildings the IVA rate can be 10 % or 21 % depending on the type of service and the contract structure; for construction or rehabilitation services for predominantly residential buildings, the Agencia Tributaria states 10 % under certain conditions, while other supplies or repair constellations may be subject to the general rate. (<a href=\"https:\/\/sede.agenciatributaria.gob.es\/Sede\/iva\/iva-operaciones-inmobiliarias\/que-tipo-se-aplica-obras-viviendas\/obras-construccion-rehabilitacion.html\" target=\"_blank\" rel=\"noopener\">Agencia Tributaria<\/a>)<\/li>\n<li>ITP\/AJD is administered in the Balearics by the ATIB and concerns, among other things, transfers for consideration, notarial documents and certain legal acts; it therefore belongs in every acquisition and building-cost plan. (<a href=\"https:\/\/www.atib.es\/TA\/contenido.aspx?Id=9854&amp;lang=es\" target=\"_blank\" rel=\"noopener\">atib.es<\/a>)<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>7. Construction process \u2013 typical management phases<\/strong><\/h2>\n<h3 style=\"text-align: center;\">Phase 1: Plot and feasibility<\/h3>\n<ul style=\"text-align: center;\">\n<li>land register \/ Registro<\/li>\n<li>cadastre \/ Catastro<\/li>\n<li>classification: suelo urbano, urbanizable, r\u00fastico<\/li>\n<li>development parameters<\/li>\n<li>protected areas, coastal law, heritage protection, watercourses, easements<\/li>\n<li>preliminary review by architect and lawyer<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Phase 2: Project definition<\/h3>\n<ul style=\"text-align: center;\">\n<li>room programme<\/li>\n<li>budget framework<\/li>\n<li>quality standard<\/li>\n<li>schedule targets<\/li>\n<li>tender strategy<\/li>\n<li>contract model: general contractor, individual trades, mixed model<\/li>\n<li>internal interface to <a href=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/D1_DOKUMENTENFUeHRER-COAIB-deu-jle.pdf\"><strong>D1 jle <\/strong><\/a><\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Phase 3: Permit project<\/h3>\n<ul style=\"text-align: center;\">\n<li>Proyecto b\u00e1sico<\/li>\n<li>submission to the municipality<\/li>\n<li>review of licensability<\/li>\n<li>where applicable opinions of further authorities<\/li>\n<li>Balearic planning regulation distinguishes the permit-ready project and the execution project; a proyecto b\u00e1sico can suffice for the licence but is not sufficient to start building. (<a href=\"https:\/\/www.caib.es\/sites\/normativa_dgha\/f\/488390\" target=\"_blank\" rel=\"noopener\">Web GOIB<\/a>)<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Phase 4: Execution project<\/h3>\n<ul style=\"text-align: center;\">\n<li>Proyecto de ejecuci\u00f3n<\/li>\n<li>technical detailing<\/li>\n<li>material and construction specifications<\/li>\n<li>specialist design<\/li>\n<li>bills of quantities<\/li>\n<li>cost review<\/li>\n<li>tender<\/li>\n<\/ul>\n<p style=\"text-align: center;\">Under Balearic law the execution project must fully develop the b\u00e1sico; it must not worsen or change the approved uses and conditions. Once submitted to the Ayuntamiento, the technical project becomes the official document, for whose technical correctness the author is responsible. (<a href=\"https:\/\/www.caib.es\/sites\/normativa_dgha\/f\/488390\" target=\"_blank\" rel=\"noopener\">Web GOIB<\/a>)<\/p>\n<h3 style=\"text-align: center;\">Phase 5: Tender and award<\/h3>\n<ul style=\"text-align: center;\">\n<li>clear description of services<\/li>\n<li>quantity take-off<\/li>\n<li>unit prices or lump-sum price<\/li>\n<li>payment plan according to progress<\/li>\n<li>variation rules<\/li>\n<li>construction time and contractual penalties<\/li>\n<li>retention of security amounts<\/li>\n<li>guarantees<\/li>\n<li>documentation duties<\/li>\n<li>interface: <a href=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/D1_DOKUMENTENFUeHRER-COAIB-deu-jle.pdf\"><strong>D1 jle <\/strong><\/a><\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Phase 6: Start of construction<\/h3>\n<ul style=\"text-align: center;\">\n<li>check licence<\/li>\n<li>proyecto de ejecuci\u00f3n validated<\/li>\n<li>safety plan approved<\/li>\n<li>site opening<\/li>\n<li>insurance<\/li>\n<li>working hours, quiet hours and local requirements<\/li>\n<li>site sign<\/li>\n<li>access regulation<\/li>\n<li>Libro de \u00d3rdenes<\/li>\n<li>Libro de Incidencias<\/li>\n<li>Libro de Subcontrataci\u00f3n<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Phase 7: Construction execution<\/h3>\n<ul style=\"text-align: center;\">\n<li>regular site meetings<\/li>\n<li>minutes with responsibilities and deadlines<\/li>\n<li>technical instructions only via the Direcci\u00f3n Facultativa<\/li>\n<li>variations only in writing<\/li>\n<li>partial invoices only against verified progress<\/li>\n<li>document quality inspections<\/li>\n<li>secure photos, delivery notes, test reports, material approvals<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Phase 8: Acceptance and final documentation<\/h3>\n<ul style=\"text-align: center;\">\n<li>defects list<\/li>\n<li>partial or final acceptance<\/li>\n<li>final certificate<\/li>\n<li>Liquidaci\u00f3n final<\/li>\n<li>guarantees<\/li>\n<li>Libro del Edificio<\/li>\n<li>questions of use \/ first occupation<\/li>\n<li>tax and final accounting<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>8. Rights and duties on site<\/strong><\/h2>\n<h3 style=\"text-align: center;\">Client \/ promotor<\/h3>\n<ul style=\"text-align: center;\">\n<li>may decide project goals, budget and award<\/li>\n<li>must commission specialists<\/li>\n<li>must ensure permits, insurance and documentation<\/li>\n<li>must commission contractor and subcontractors<\/li>\n<li>may not deviate from the approved project on their own without technical and legal review<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Architect \/ director de obra<\/h3>\n<ul style=\"text-align: center;\">\n<li>gives technical instructions<\/li>\n<li>must check project, licence and construction execution<\/li>\n<li>documents instructions<\/li>\n<li>checks project-relevant changes<\/li>\n<li>confirms progress and final condition<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Technical architect \/ director de ejecuci\u00f3n<\/h3>\n<ul style=\"text-align: center;\">\n<li>checks acceptance of materials<\/li>\n<li>controls quantities and execution<\/li>\n<li>can demand material tests<\/li>\n<li>prepares partial certificates and technical billing bases<\/li>\n<li>documents quality control<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Safety coordinator<\/h3>\n<ul style=\"text-align: center;\">\n<li>controls safety coordination<\/li>\n<li>approves safety plan<\/li>\n<li>keeps or administers the Libro de Incidencias<\/li>\n<li>can stop works in the case of serious safety risks. (<a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1997-22614\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Contractor<\/h3>\n<ul style=\"text-align: center;\">\n<li>must build according to project and contract<\/li>\n<li>must follow the instructions of the Direcci\u00f3n Facultativa<\/li>\n<li>must provide qualified staff, material and site organisation<\/li>\n<li>may under certain circumstances use subcontractors within the contract and the statutory requirements<\/li>\n<li>is liable for their own execution and for the subcontractors they commission. (<a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Subcontractors<\/h3>\n<ul style=\"text-align: center;\">\n<li>may only work in the permissible subcontracting model<\/li>\n<li>must be integrated into safety coordination<\/li>\n<li>must carry out their services in accordance with project and contract<\/li>\n<li>may not extend certain subcontracting chains at will<\/li>\n<\/ul>\n<p style=\"text-align: center;\">The Spanish subcontracting regulation requires, among other things, own organisation, resources, preventive training and registration in the register of accredited companies; subcontracting chains and the <strong>Libro de Subcontrataci\u00f3n<\/strong> are also regulated by law. (<a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-2006-18205\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/p>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>9. Internal reference:<\/strong><\/h2>\n<ul style=\"text-align: center;\">\n<li>see <a href=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/D1_DOKUMENTENFUeHRER-COAIB-deu-jle.pdf\"><strong>Document guide D1 jle<\/strong><\/a> for the role model and project structure COAIB<\/li>\n<li>every role must be described with competence, liability, decision right and documentation duty<\/li>\n<li>no verbal side agreements without minutes<\/li>\n<li>no variations without written approval<\/li>\n<li>no interim payment without verified performance<\/li>\n<li>no technical change without review by architect and t\u00e9cnico<\/li>\n<li>no tax structuring without a tax adviser<\/li>\n<li>no legal commitment without review by a lawyer<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>10. Core statement<\/strong><\/h2>\n<p style=\"text-align: center;\">When building in Mallorca, security does not arise from one strong individual but from clean separation of tasks. The architect leads the project technically and in design terms, the technical architect controls execution and quality, the contractor builds, the project manager steers costs, deadlines and communication, the lawyer secures contracts and building law, the tax adviser checks IVA, ITP, AJD and payment structure. Only this separation makes a building project controllable.<\/p>\n<h2 style=\"text-align: center;\">FAQ<\/h2>\n<h3 style=\"text-align: center;\">Is a good architect enough without project management?<\/h3>\n<p style=\"text-align: center;\">For small projects this can be sufficient. For more complex projects, additional management is often a great advantage. jle then offers project management as well.<\/p>\n<h3 style=\"text-align: center;\">Is project management only sensible for luxury projects?<\/h3>\n<p style=\"text-align: center;\">No. It is helpful wherever several parties have to be coordinated.<\/p>\n<h3 style=\"text-align: center;\"><strong>A good project does not run by itself \u2013 it is well led.<\/strong><\/h3>\n<h3 style=\"text-align: center;\"><strong><a href=\"mailto:ratgeber@jle.de\">talk to us<\/a><\/strong><\/h3>\n<h4 style=\"text-align: center;\"><strong><a href=\"mailto:ratgeber-pdf@jle.de\">Request the guide to building in Mallorca and the Balearics<\/a><\/strong><\/h4>\n<p style=\"text-align: center;\">or<\/p>\n<h3 style=\"text-align: center;\"><strong>create a jle online checklist<\/strong><\/h3>\n<h2 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/jle_checkliste_final_mobile_pdf_v22.html\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-35622\" src=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-600x400.png\" alt=\"building in Mallorca and the Balearics checklist\" width=\"172\" height=\"115\" srcset=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-600x400.png 600w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-640x427.png 640w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-768x512.png 768w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-1220x813.png 1220w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39.png 1536w\" sizes=\"auto, (max-width: 172px) 100vw, 172px\" \/><\/a><\/h2>\n<p style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/en\/building-in-mallorca-and-the-balearics-guide\/\">back to the building in Mallorca guide<\/a><\/p>\n<p style=\"text-align: center;\">References<\/p>\n<p style=\"text-align: center;\">Ley de Ordenaci\u00f3n de la Edificaci\u00f3n <a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a> Roles and responsibilities<\/p>\n<p style=\"text-align: center;\">Ley 7\/2024 <a href=\"https:\/\/www.caib.es\/sites\/institutestudisautonomics\/es\/n\/ley_72024_de_11_de_diciembre_de_medidas_urgentes_de_simplificacian_y_racionalizacian_administrativas_de_las_administraciones_pablicas_de_las_illes_balears\/\" target=\"_blank\" rel=\"noopener\">CAIB<\/a> New Balearic organisational framework<\/p>\n<p style=\"text-align: center;\">ECU information <a href=\"https:\/\/www.caib.es\/pidip2front\/jsp\/es\/ficha-convocatoria\/el-govern-se-reune-con-los-ayuntamientos-en-la-felib-para-informar-sobre-la-implantacion-de-las-entidades-colaboradoras-urbanisticas\" target=\"_blank\" rel=\"noopener\">CAIB<\/a> Procedure acceleration and ECU<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Is a good architect enough without project management?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"For small projects this can be sufficient. For more complex projects, additional management is often a great advantage. jle then offers project management as well.\"}},{\"@type\":\"Question\",\"name\":\"Is project management only sensible for luxury projects?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. It is helpful wherever several parties have to be coordinated.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Management, Construction Process and Responsibilities in Mallorca Responsibilities and structure A building project is never just design and execution. It is always also a process of decisions, coordination, deadlines, budgets and responsibilities. That is exactly why project management in Mallorca is so often underestimated \u2013 although in practice it decides between calm and friction. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"footnotes":""},"class_list":["post-38623","page","type-page","status-publish","hentry"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages\/38623","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/comments?post=38623"}],"version-history":[{"count":2,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages\/38623\/revisions"}],"predecessor-version":[{"id":38625,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages\/38623\/revisions\/38625"}],"wp:attachment":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/media?parent=38623"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}