{"id":38618,"date":"2026-11-20T16:28:00","date_gmt":"2026-11-20T15:28:00","guid":{"rendered":"https:\/\/jle.de\/?page_id=38618"},"modified":"2026-11-20T16:28:00","modified_gmt":"2026-11-20T15:28:00","slug":"new-build-conversion-or-refurbishment-mallorca","status":"publish","type":"page","link":"https:\/\/jle.de\/en\/new-build-conversion-or-refurbishment-mallorca\/","title":{"rendered":"New Build, Conversion or Refurbishment in Mallorca"},"content":{"rendered":"<p><a href=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/jle_checkliste_final_mobile_pdf_v22.html\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-35622\" src=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-600x400.png\" alt=\"building in Mallorca and the Balearics checklist\" width=\"172\" height=\"115\" srcset=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-600x400.png 600w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-640x427.png 640w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-768x512.png 768w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-1220x813.png 1220w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39.png 1536w\" sizes=\"auto, (max-width: 172px) 100vw, 172px\" \/><\/a><\/p>\n<p style=\"text-align: center;\">online jle checklist<\/p>\n<h1 style=\"text-align: center;\"><strong>New Build, Conversion or Refurbishment in Mallorca<\/strong><\/h1>\n<p style=\"text-align: center;\">Many projects in Mallorca do not begin with an empty plot but with an existing house. The fundamental question then arises quickly: is the existing building worth keeping, or does a clean start make more sense? The right answer does not depend on gut feeling but on substance, documentation, the idea for use and the target picture.<\/p>\n<p style=\"text-align: center;\">The decision between a new build and refurbishment in Mallorca is not a question of style. It is legal, technical and economic. A new build creates clarity. A refurbishment demands a precise assessment of the existing building. (<a href=\"https:\/\/www.caib.es\/sites\/institutestudisautonomics\/es\/n\/decreto_ley_32024_de_24_de_mayo_de_medidas_urgentes_de_simplificacian_y_racionalizacian_administrativas_de_las_administraciones_pablicas_de_las_illes_balears\/\" target=\"_blank\" rel=\"noopener\">Web GOIB<\/a>)<\/p>\n<p style=\"text-align: center;\">The same principle applies to both routes. A visible building and a building that is secure in planning-law terms are not the same thing. With older houses, fincas and extended existing properties in particular, it must be checked before any decision whether documentation, substance and the idea for use fit together. The current reforms have opened special routes for certain time-barred cases. They have not, however, abolished the basic duty to assess the existing building. (<a href=\"https:\/\/www.caib.es\/sites\/institutestudisautonomics\/es\/n\/decreto_ley_32024_de_24_de_mayo_de_medidas_urgentes_de_simplificacian_y_racionalizacian_administrativas_de_las_administraciones_pablicas_de_las_illes_balears\/\" target=\"_blank\" rel=\"noopener\">Web GOIB<\/a>)<\/p>\n<p style=\"text-align: center;\">Technically, the general Spanish building standard also remains decisive. Anyone who builds or carries out a deep refurbishment always operates within the logic of the LOE and the CTE. That is exactly where long-term value retention begins. (<a href=\"https:\/\/www.caib.es\/pidip2front\/jsp\/es\/ficha-convocatoria\/el-govern-se-reune-con-los-ayuntamientos-en-la-felib-para-informar-sobre-la-implantacion-de-las-entidades-colaboradoras-urbanisticas\" target=\"_blank\" rel=\"noopener\">Web GOIB<\/a>)<\/p>\n<h4 style=\"text-align: center;\"><strong>When a new build is the better solution<\/strong><\/h4>\n<p style=\"text-align: center;\">A new build offers maximum freedom in spatial concept, building services, energy, floor plan and design clarity. It often makes sense when a plot offers good conditions and the desired use is to be developed afresh without compromise.<\/p>\n<h4 style=\"text-align: center;\"><strong>When refurbishment offers real added value<\/strong><\/h4>\n<p style=\"text-align: center;\">A refurbishment can be strong when location, structure and character already bring a great deal of quality. In Mallorca in particular, grown substance can be very valuable in terms of atmosphere. The prerequisite is that the existing building is technically sound and sufficiently clarified in legal terms.<\/p>\n<h4 style=\"text-align: center;\"><strong>Conversion does not automatically mean less effort<\/strong><\/h4>\n<p style=\"text-align: center;\">Many owners expect a conversion to be simpler or cheaper than a new build. This is often not the case. Hidden damage, old installations, damp building elements, structural issues, unclear areas or problematic extensions can make an existing building considerably more complex than first thought.<\/p>\n<h2 style=\"text-align: center;\"><strong>New build, conversion or refurbishment in Mallorca \u2013 when is which more sensible?<\/strong><\/h2>\n<h3 style=\"text-align: center;\"><strong>Principle<\/strong><\/h3>\n<p style=\"text-align: center;\"><strong>It is not the building idea that decides first, but the plot.<\/strong><\/p>\n<p style=\"text-align: center;\">Decisive are:<\/p>\n<ul style=\"text-align: center;\">\n<li>land class: suelo urbano, urbanizable, suelo r\u00fastico<\/li>\n<li>the applicable municipal plan: PGOU \/ Normas Subsidiarias<\/li>\n<li>requirements of the Pla Territorial Insular de Mallorca (PTIM)<\/li>\n<li>protection categories, risk zones, slopes, torrente, coastal protection, heritage protection<\/li>\n<li>existing legality of the building<\/li>\n<li>permissibility<\/li>\n<li>construction costs, building time, servicing, logistics and project management<\/li>\n<\/ul>\n<p style=\"text-align: center;\">Among other things, the PTIM contains maps of urban development areas, categories of suelo r\u00fastico, risk prevention, landscape integration, infrastructure and culturally or naturally relevant routes. This check belongs before any purchase or project decision. (<a href=\"https:\/\/pterritorial.conselldemallorca.es\/es\/pla-territorial-insular-de-mallorca\" target=\"_blank\" rel=\"noopener\">pterritorial.conselldemallorca.es<\/a>)<\/p>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>When a new build makes sense<\/strong><\/h2>\n<p style=\"text-align: center;\"><strong>When the plot can be built on cleanly in planning-law terms.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>clear plot boundaries<\/li>\n<li>secured access<\/li>\n<li>secured servicing<\/li>\n<li>no unresolved legacy contamination<\/li>\n<li>no hidden illegal existing buildings<\/li>\n<li>no protection or risk zones that restrict the project significantly<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When maximum plannability is wanted.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>clear spatial structure<\/li>\n<li>modern building services<\/li>\n<li>energy efficiency from the start<\/li>\n<li>pool, outdoor areas, porche, pergola and garden as an overall concept<\/li>\n<li>fewer compromises due to old structures, damp or earlier conversions<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the existing building offers no architectural, legal or economic advantage.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>poor building fabric<\/li>\n<li>low ceilings<\/li>\n<li>unfavourable room layouts<\/li>\n<li>damp walls<\/li>\n<li>deficient foundations<\/li>\n<li>inadequate installations<\/li>\n<li>many earlier extensions without a clear approval situation<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When a high-quality, long-term concept of use is planned.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>private residence<\/li>\n<li>holiday home<\/li>\n<li>hideaway<\/li>\n<li>retirement home<\/li>\n<li>rentable property with clear technical documentation<\/li>\n<li>valuable property with a clean project archive<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When a new build is more economical than a deep core refurbishment.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>especially with structurally weak buildings<\/li>\n<li>when roof, building services, waterproofing, windows, floor build-up and drainage all need complete renewal<\/li>\n<li>when earthquake, damp or thermal protection quality is lacking<\/li>\n<li>with massive interventions in structure and terrain<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the topography is manageable.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>simple site access<\/li>\n<li>little earthmoving<\/li>\n<li>no elaborate retaining walls<\/li>\n<li>no problematic slope drainage<\/li>\n<li>no difficult crane, concrete or material logistics<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>When refurbishment makes sense<\/strong><\/h2>\n<p style=\"text-align: center;\"><strong>When the existing building is legal, valuable and approvable.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>existing licencia<\/li>\n<li>documented older building<\/li>\n<li>cadastre, land register and reality largely agree<\/li>\n<li>no open infringements<\/li>\n<li>no unapproved volumes, terraces, pools or changes of use<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the existing building offers a location or grandfathering advantage.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>very good location<\/li>\n<li>grown integration into the landscape<\/li>\n<li>traditional Mallorcan character<\/li>\n<li>natural stone walls<\/li>\n<li>old timber beams<\/li>\n<li>patina, scale, genius loci<\/li>\n<li>volume that might no longer be approved as new today<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the interventions can be kept limited.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>repairing the roof instead of rebuilding it completely<\/li>\n<li>renewing building services<\/li>\n<li>remedying damp<\/li>\n<li>modernising windows, floors, bathrooms, kitchen<\/li>\n<li>improving room sequences<\/li>\n<li>organising outdoor areas<\/li>\n<li>increasing energy efficiency<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the house is atmospherically stronger than a new build.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>historic finca<\/li>\n<li>village house<\/li>\n<li>townhouse in Palma or in grown town centres<\/li>\n<li>natural stone architecture<\/li>\n<li>old room proportions<\/li>\n<li>authentic materiality<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When refurbishment is thought together with interior design and value retention.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>choice of materials<\/li>\n<li>lighting<\/li>\n<li>acoustics<\/li>\n<li>haptics<\/li>\n<li>furnishing<\/li>\n<li>built-ins<\/li>\n<li>textiles<\/li>\n<li>natural stone, wood, lime plaster, ceramics<\/li>\n<li>functional floor-plan optimisation instead of decorative surface refurbishment<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>When a conversion makes sense<\/strong><\/h2>\n<p style=\"text-align: center;\"><strong>When the existing building is fundamentally usable but no longer suits the use.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>old room layout<\/li>\n<li>kitchen too small<\/li>\n<li>missing master suite<\/li>\n<li>poor connection between interior and outdoor space<\/li>\n<li>unused outbuildings<\/li>\n<li>missing shading<\/li>\n<li>unclear circulation<\/li>\n<li>weak relationship to pool, garden or terrace<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When selective interventions bring great benefit.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>opening to the outdoor space<\/li>\n<li>new stair layout<\/li>\n<li>better daylight<\/li>\n<li>stronger cross-ventilation<\/li>\n<li>new bathrooms<\/li>\n<li>technical upgrading<\/li>\n<li>integration of storage<\/li>\n<li>improving everyday usability and rentability<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the project remains simpler in permit terms than a new build.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>no complete reconstruction<\/li>\n<li>no large volume extension<\/li>\n<li>no change to the basic planning parameters<\/li>\n<li>no interventions in protected facades or landscape elements<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\">When refurbishment becomes risky<\/h2>\n<p style=\"text-align: center;\"><strong>When the legality of the existing building is unclear.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>extensions without approval<\/li>\n<li>pool without approval<\/li>\n<li>terrace roofs without proof<\/li>\n<li>converted garages<\/li>\n<li>extended basements<\/li>\n<li>use as living space although only agricultural or technical use was approved<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the building condition is underestimated.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>damp in natural stone masonry<\/li>\n<li>missing horizontal damp-proof courses<\/li>\n<li>old pipes<\/li>\n<li>weak foundations<\/li>\n<li>deficient roof connections<\/li>\n<li>settlement<\/li>\n<li>cracks<\/li>\n<li>deficient drainage<\/li>\n<li>hidden damage from earlier cheap refurbishments<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the desired comfort does not suit the existing building.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>large glazed areas in a historic structure<\/li>\n<li>heavy building services in a weak structure<\/li>\n<li>modern ceiling heights in an old house<\/li>\n<li>underground garage on a tight plot<\/li>\n<li>pool plant without space<\/li>\n<li>air conditioning without routes for ducts<\/li>\n<li>smart-home wishes without technical infrastructure<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When a \u201csmall refurbishment\u201d actually becomes a core refurbishment.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>new roof<\/li>\n<li>new electrics<\/li>\n<li>new plumbing<\/li>\n<li>new waterproofing<\/li>\n<li>new windows<\/li>\n<li>new floors<\/li>\n<li>new facades<\/li>\n<li>new structure<\/li>\n<li>new outdoor areas \u2192 then a new build or partial new build is often more economical to examine.<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\">When a new build becomes risky<\/h2>\n<p style=\"text-align: center;\"><strong>When the plot is only apparently buildable.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>unclear land class<\/li>\n<li>missing servicing<\/li>\n<li>sloping site<\/li>\n<li>protected area<\/li>\n<li>risk zone<\/li>\n<li>proximity to a torrente<\/li>\n<li>problematic access<\/li>\n<li>set-back distances<\/li>\n<li>restricted heights, volumes or roof forms<\/li>\n<li>local design requirements<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the outdoor areas are underestimated.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>retaining walls<\/li>\n<li>access roads<\/li>\n<li>cisterns<\/li>\n<li>drainage<\/li>\n<li>pool<\/li>\n<li>plant rooms<\/li>\n<li>pergolas<\/li>\n<li>terraces<\/li>\n<li>lighting<\/li>\n<li>irrigation<\/li>\n<li>native vegetation<\/li>\n<li>natural stone walls<\/li>\n<li>boundary enclosures<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the plot lies in suelo r\u00fastico.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>stricter landscape integration<\/li>\n<li>often additional reports or opinions<\/li>\n<li>restricted uses<\/li>\n<li>limited sealing of surfaces<\/li>\n<li>water, wastewater and rainwater concepts<\/li>\n<li>special requirements for pool, garden and technical installations. Among other things, the LUIB provides for rainwater-use requirements for projects in suelo r\u00fastico and limits new pools for single-family houses in suelo r\u00fastico to certain sizes. (<a href=\"https:\/\/www.caib.es\/sites\/normativa_dgha\/f\/488390\" target=\"_blank\" rel=\"noopener\">Web GOIB<\/a>)<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>When the client looks only at the house price.<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>project costs<\/li>\n<li>fees<\/li>\n<li>survey<\/li>\n<li>soil report<\/li>\n<li>geotechnics<\/li>\n<li>structural engineering<\/li>\n<li>taxes<\/li>\n<li>charges<\/li>\n<li>connections<\/li>\n<li>outdoor areas<\/li>\n<li>project management<\/li>\n<li>insurance<\/li>\n<li>extended construction time<\/li>\n<li>price increases<\/li>\n<li>variations<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>Economic decision criteria<\/strong><\/h2>\n<h3 style=\"text-align: center;\">A new build is often better when:<\/h3>\n<ul style=\"text-align: center;\">\n<li>the plot is legally clean<\/li>\n<li>the desired use is clearly defined<\/li>\n<li>high energy efficiency is wanted<\/li>\n<li>the architecture is meant to create value in the long term<\/li>\n<li>refurbishment would cost more than 60\u201370 % of a new build<\/li>\n<li>there is no special historic quality<\/li>\n<li>construction time is to be better controllable<\/li>\n<li>later documentation, sale or letting are important<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Refurbishment is often better when:<\/h3>\n<ul style=\"text-align: center;\">\n<li>the existing building is legal and documented<\/li>\n<li>location and character are exceptional<\/li>\n<li>existing volumes can be retained<\/li>\n<li>traditional substance adds value<\/li>\n<li>interventions remain technically manageable<\/li>\n<li>no deep structural interventions are needed<\/li>\n<li>approval risks are lower than for a new build<\/li>\n<li>the existing building would no longer be approvable as new today<\/li>\n<\/ul>\n<h3 style=\"text-align: center;\">Conversion is often better when:<\/h3>\n<ul style=\"text-align: center;\">\n<li>the basic structure works<\/li>\n<li>use and comfort are to be improved<\/li>\n<li>the existing building is solid<\/li>\n<li>the intervention remains moderate in planning-law terms<\/li>\n<li>budget and construction time are to be limited<\/li>\n<li>interior design, light, material and floor plan create the greatest effect<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>Approval and procedure<\/strong><\/h2>\n<p style=\"text-align: center;\"><strong>New build<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>regularly the most demanding approval procedure<\/li>\n<li>complete architectural project<\/li>\n<li>specialist technical design<\/li>\n<li>structural engineering<\/li>\n<li>energy and building-services concepts<\/li>\n<li>review by the municipality and, where applicable, other bodies<\/li>\n<li>in suelo r\u00fastico often additional territorial and landscape review<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Conversion<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>depends on the intervention<\/li>\n<li>simple works can be obra menor<\/li>\n<li>structural interventions, facade changes, changes of use or extensions can be obra mayor<\/li>\n<li>the exact classification is made by the municipality<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Refurbishment<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>not automatically simpler<\/li>\n<li>technical refurbishment can become demanding in permit terms<\/li>\n<li>especially with structure, roof, facade, use, volume, heritage protection or outdoor areas<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Observe CTE and LOE<\/strong><\/p>\n<p style=\"text-align: center;\">The Spanish C\u00f3digo T\u00e9cnico de la Edificaci\u00f3n applies to building projects whose documents require a licence or authorisation required by law. (<a href=\"https:\/\/www.boe.es\/buscar\/doc.php?id=BOE-A-2006-5515\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/p>\n<p style=\"text-align: center;\">The Ley de Ordenaci\u00f3n de la Edificaci\u00f3n defines the roles of those involved in building, including project author, site manager and execution manager. The director de ejecuci\u00f3n de obra monitors the material execution as well as the quality and quantities of the work. (<a href=\"https:\/\/www.boe.es\/buscar\/doc.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a>)<\/p>\n<hr \/>\n<h2 style=\"text-align: center;\">Assessing the existing building before any refurbishment<\/h2>\n<p style=\"text-align: center;\"><strong>Legal review<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>land register<\/li>\n<li>cadastre<\/li>\n<li>escritura<\/li>\n<li>licencia de obra<\/li>\n<li>certificado final de obra<\/li>\n<li>licencia de primera ocupaci\u00f3n<\/li>\n<li>c\u00e9dula de habitabilidad<\/li>\n<li>open proceedings<\/li>\n<li>possible infringements<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Planning review<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>c\u00e9dula urban\u00edstica (planning certificate)<\/li>\n<li>land class<\/li>\n<li>buildability<\/li>\n<li>permitted use<\/li>\n<li>volume<\/li>\n<li>heights<\/li>\n<li>distances<\/li>\n<li>protection categories<\/li>\n<li>risk zones<\/li>\n<li>torrente<\/li>\n<li>coastal protection<\/li>\n<li>heritage protection<\/li>\n<li>municipal planning<\/li>\n<li>PTIM<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Technical review<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>structure<\/li>\n<li>roof<\/li>\n<li>damp<\/li>\n<li>foundations<\/li>\n<li>installations<\/li>\n<li>wastewater<\/li>\n<li>electricity<\/li>\n<li>water<\/li>\n<li>access<\/li>\n<li>slope pressure<\/li>\n<li>drainage<\/li>\n<li>fire protection<\/li>\n<li>energy efficiency<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Economic review<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>realistic cost framework<\/li>\n<li>reserves for the unforeseen<\/li>\n<li>construction time<\/li>\n<li>availability of trades<\/li>\n<li>material logistics<\/li>\n<li>ferry and island prices<\/li>\n<li>site access<\/li>\n<li>variation risk<\/li>\n<li>contract structure<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>Role of the architect, the technical architect and project management<\/strong><\/h2>\n<p style=\"text-align: center;\"><strong>Architect<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>design<\/li>\n<li>permit design<\/li>\n<li>construction design<\/li>\n<li>overall design and technical coordination<\/li>\n<li>coordination with the municipality and specialist planners<\/li>\n<li>checking that execution matches the project<\/li>\n<li>overall site supervision<\/li>\n<li>acceptance after completion and project close-out<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Technical architect \/ aparejador \u2013 included in jle\u2019s scope of services<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>execution control<\/li>\n<li>quantity and quality control<\/li>\n<li>site coordination<\/li>\n<li>health and safety coordination, if commissioned<\/li>\n<li>technical documentation<\/li>\n<li>involvement in project close-out<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Project management \/ client representation \u2013 additional services of the architect at jle<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>cost control<\/li>\n<li>schedule management<\/li>\n<li>tendering<\/li>\n<li>comparison of offers<\/li>\n<li>contract management<\/li>\n<li>checking variations<\/li>\n<li>interface coordination<\/li>\n<li>communication between client, architect, lawyer, tax adviser and contractor<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Lawyer<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>purchase review<\/li>\n<li>legality review<\/li>\n<li>contract review<\/li>\n<li>approval risks<\/li>\n<li>easements<\/li>\n<li>encumbrances, proceedings, infringements<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>Tax adviser<\/strong><\/p>\n<ul style=\"text-align: center;\">\n<li>acquisition costs<\/li>\n<li>ITP, AJD, IVA<\/li>\n<li>tax structure<\/li>\n<li>invoice review<\/li>\n<li>letting or own-use model<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>Typical wrong decisions<\/strong><\/h2>\n<ul style=\"text-align: center;\">\n<li>Buying without a complete planning review and without comparing the building file, the applicable planning law \u201cc\u00e9dula urban\u00edstica\u201d (planning certificate), the approved existing building and \u2013 where available \u2013 current municipal planning information<\/li>\n<li>Refurbishing an existing building that is not (fully) legal<\/li>\n<li>Planning a new build without checking topography and servicing<\/li>\n<li>Underestimating outdoor areas<\/li>\n<li>Missing cost reserve<\/li>\n<li>The building contractor as sole project manager<\/li>\n<li>No independent review of offers<\/li>\n<li>No clear separation of design, control and execution<\/li>\n<li>Involving lawyer and tax adviser too late<\/li>\n<li>No review of the building file, final de obra (building acceptance) and licencia<\/li>\n<li>Interior design only after the shell instead of from the start<\/li>\n<li>Garden, pool, water and drainage not planned as part of the overall project<\/li>\n<\/ul>\n<hr \/>\n<h2 style=\"text-align: center;\"><strong>Decision formula for clients<\/strong><\/h2>\n<p style=\"text-align: center;\"><strong>New build<\/strong>, when law, plot, budget and use are clear.<\/p>\n<p style=\"text-align: center;\"><strong>Refurbishment<\/strong>, when the existing building, location and character are stronger than the risks.<\/p>\n<p style=\"text-align: center;\"><strong>Conversion<\/strong>, when the substance is good and targeted interventions create the greatest added value.<\/p>\n<p style=\"text-align: center;\"><strong>Demolition or partial new build<\/strong>, when refurbishment is out of proportion technically and economically.<\/p>\n<p style=\"text-align: center;\"><strong>No project start<\/strong> as long as legality, approvability, cost framework and project management have not been reliably clarified.<\/p>\n<h2 style=\"text-align: center;\">FAQ<\/h2>\n<h3 style=\"text-align: center;\">Is refurbishing in Mallorca generally cheaper?<\/h3>\n<p style=\"text-align: center;\">No. Refurbishment can make economic sense, but it is by no means automatically cheaper.<\/p>\n<h3 style=\"text-align: center;\">When should demolition be seriously considered?<\/h3>\n<p style=\"text-align: center;\">Whenever the existing building, structure, legalisation and desired use no longer fit together sensibly.<\/p>\n<h4 style=\"text-align: center;\">The right decision does not arise from sympathy for the existing building but from an honest assessment.<\/h4>\n<p style=\"text-align: center;\">project examples:<\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/en\/finca-1-bonus-1323-son-dc-majorca-country-side\/\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-35029\" src=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/dji_fly_20251023_192832_0018_1761242511165_photo-600x400.jpg\" alt=\"1323 son dc finca Felanitx\" width=\"399\" height=\"266\" srcset=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/dji_fly_20251023_192832_0018_1761242511165_photo-600x400.jpg 600w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/dji_fly_20251023_192832_0018_1761242511165_photo-1536x1024.jpg 1536w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/dji_fly_20251023_192832_0018_1761242511165_photo-2048x1365.jpg 2048w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/dji_fly_20251023_192832_0018_1761242511165_photo-640x427.jpg 640w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/dji_fly_20251023_192832_0018_1761242511165_photo-768x512.jpg 768w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/dji_fly_20251023_192832_0018_1761242511165_photo-1220x813.jpg 1220w\" sizes=\"auto, (max-width: 399px) 100vw, 399px\" \/><\/a><\/p>\n<p style=\"text-align: center;\">1323 finca son dc, felanitx<\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/en\/finca-1-bonus-en-majorca-na-borras\/\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-34471\" src=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/02\/1710-cover-archdaily.jpeg\" alt=\"finca 1710 Cala Llombards Mallorca\" width=\"399\" height=\"266\" srcset=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/02\/1710-cover-archdaily.jpeg 2048w, https:\/\/jle.de\/wp-content\/uploads\/2026\/02\/1710-cover-archdaily-1536x1023.jpeg 1536w, https:\/\/jle.de\/wp-content\/uploads\/2026\/02\/1710-cover-archdaily-640x426.jpeg 640w\" sizes=\"auto, (max-width: 399px) 100vw, 399px\" \/><\/a><\/p>\n<p style=\"text-align: center;\">1710 finca na borras, cala llombards<\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/en\/1906-majorca-new-anthroposophic-property\/\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-35558\" src=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/29-scaled.png\" alt=\"1906 new house Calvi\u00e0 Mallorca\" width=\"408\" height=\"296\" srcset=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/29-scaled.png 2560w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/29-1536x1114.png 1536w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/29-2048x1485.png 2048w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/29-640x464.png 640w\" sizes=\"auto, (max-width: 408px) 100vw, 408px\" \/><\/a><\/p>\n<p style=\"text-align: center;\">1906 new build sol de mallorca<\/p>\n<h3 style=\"text-align: center;\"><strong><a href=\"mailto:ratgeber@jle.de\">talk to us<\/a><\/strong><\/h3>\n<h4 style=\"text-align: center;\"><strong><a href=\"mailto:ratgeber-pdf@jle.de\">Request the guide to building in Mallorca and the Balearics<\/a><\/strong><\/h4>\n<p style=\"text-align: center;\">or<\/p>\n<h3 style=\"text-align: center;\"><strong>create a jle online checklist<\/strong><\/h3>\n<p style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/en\/building-in-mallorca-and-the-balearics-guide\/\">back to the building in Mallorca guide<\/a><\/p>\n<p style=\"text-align: center;\">References<\/p>\n<p style=\"text-align: center;\">Ley de Ordenaci\u00f3n de la Edificaci\u00f3n <a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a> Roles, liability, responsibilities<\/p>\n<p style=\"text-align: center;\">C\u00f3digo T\u00e9cnico de la Edificaci\u00f3n <a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-2006-5515\" target=\"_blank\" rel=\"noopener\">BOE<\/a> Technical requirements for new builds and refurbishments<\/p>\n<p style=\"text-align: center;\">Decreto Ley 3\/2024 <a href=\"https:\/\/www.caib.es\/sites\/institutestudisautonomics\/es\/n\/decreto_ley_32024_de_24_de_mayo_de_medidas_urgentes_de_simplificacian_y_racionalizacian_administrativas_de_las_administraciones_pablicas_de_las_illes_balears\/\" target=\"_blank\" rel=\"noopener\">CAIB<\/a> Special rules for certain existing-building constellations<\/p>\n<p style=\"text-align: center;\">Ley 7\/2024 <a href=\"https:\/\/www.caib.es\/sites\/institutestudisautonomics\/es\/n\/ley_72024_de_11_de_diciembre_de_medidas_urgentes_de_simplificacian_y_racionalizacian_administrativas_de_las_administraciones_pablicas_de_las_illes_balears\/\" target=\"_blank\" rel=\"noopener\">CAIB<\/a> Applicable Balearic framework<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Is refurbishing in Mallorca generally cheaper?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Refurbishment can make economic sense, but it is by no means automatically cheaper.\"}},{\"@type\":\"Question\",\"name\":\"When should demolition be seriously considered?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Whenever the existing building, structure, legalisation and desired use no longer fit together sensibly.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>online jle checklist New Build, Conversion or Refurbishment in Mallorca Many projects in Mallorca do not begin with an empty plot but with an existing house. The fundamental question then arises quickly: is the existing building worth keeping, or does a clean start make more sense? The right answer does not depend on gut feeling [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"footnotes":""},"class_list":["post-38618","page","type-page","status-publish","hentry"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages\/38618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/comments?post=38618"}],"version-history":[{"count":1,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages\/38618\/revisions"}],"predecessor-version":[{"id":38619,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages\/38618\/revisions\/38619"}],"wp:attachment":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/media?parent=38618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}