{"id":38612,"date":"2026-11-20T16:25:28","date_gmt":"2026-11-20T15:25:28","guid":{"rendered":"https:\/\/jle.de\/?page_id=38612"},"modified":"2026-11-20T16:25:28","modified_gmt":"2026-11-20T15:25:28","slug":"building-in-mallorca-and-the-balearics-guide","status":"publish","type":"page","link":"https:\/\/jle.de\/en\/building-in-mallorca-and-the-balearics-guide\/","title":{"rendered":"Building in Mallorca and the Balearics: Guide"},"content":{"rendered":"<h1 style=\"text-align: center;\"><strong>Building in Mallorca and the Balearics \u2013 Guide \u2013 What Clients Need to Know<\/strong><\/h1>\n<p><a href=\"mailto:ratgeber@jle.de\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-36471 aligncenter\" src=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/ChatGPT-Image-4-may-2026-11_25_50-600x450.png\" alt=\"guide to building in Mallorca and the Balearics\" width=\"201\" height=\"151\" srcset=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/ChatGPT-Image-4-may-2026-11_25_50-600x450.png 600w, https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/ChatGPT-Image-4-may-2026-11_25_50-640x480.png 640w, https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/ChatGPT-Image-4-may-2026-11_25_50-1200x900.png 1200w, https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/ChatGPT-Image-4-may-2026-11_25_50-768x576.png 768w, https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/ChatGPT-Image-4-may-2026-11_25_50-1220x915.png 1220w, https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/ChatGPT-Image-4-may-2026-11_25_50.png 1448w\" sizes=\"auto, (max-width: 201px) 100vw, 201px\" \/><\/a><\/p>\n<p style=\"text-align: center;\">Architecture begins before the design. At the start come analysis, feasibility and clarifying the substance of the task.<\/p>\n<p style=\"text-align: center;\">A building project in Mallorca first needs a precise assessment of the plot or existing building, a realistic budget structure and a sound check of technical and legal feasibility. Only when these foundations have been reliably clarified can architecture be developed convincingly.<\/p>\n<h3 style=\"text-align: center;\"><strong>Who this guide is for<\/strong><\/h3>\n<p style=\"text-align: center;\">These pages are aimed at private clients, buyers, owners and investors who want to build new, extend, convert, refurbish or develop a rural property in Mallorca or the other Balearic Islands.<\/p>\n<h2 style=\"text-align: center;\"><strong>The main topics of this guide at a glance<\/strong><\/h2>\n<h4 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/en\/check-land-before-buying-mallorca\/\">Checking the plot and its buildability<\/a><\/h4>\n<p style=\"text-align: center;\">How to establish before buying whether a plot or existing building in Mallorca suits your project legally, technically and economically \u2013 from land classification and buildability to realistic use.<\/p>\n<h4 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/baurechtliche-instanzen-auf-mallorca-entscheidungstraeger\/\">Planning authorities in Mallorca, the Balearics and decision-makers<\/a><\/h4>\n<p style=\"text-align: center;\">Which authorities and institutions in Mallorca and the other Balearic Islands intervene in the building process \u2013 and how their responsibilities concretely influence the path to approval.<\/p>\n<h4 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/neues-baurecht-mallorca-checkliste-zu-dectreto-ley-3-2024\/\">New building law and procedures checklist, as of October 2026<\/a><\/h4>\n<p style=\"text-align: center;\">What has changed through the reforms since 2024 and their later amendments \u2013 most recently by Ley 4\/2026 \u2013 in administrative procedures, ECU and special rules in suelo r\u00fastico, and how clients should correctly assess deadlines, responsibilities and the current legal position.<\/p>\n<h4 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/en\/new-build-conversion-or-refurbishment-mallorca\/\">New build, conversion or refurbishment<\/a><\/h4>\n<p style=\"text-align: center;\">How to distinguish between a new build, extension, conversion or refurbishment, and what planning-law and technical consequences each decision has for your project in Mallorca.<\/p>\n<h4 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/baukosten-und-bauzeiten-auf-mallorca-realistisch-planen\/\">Costs and construction times<\/a><\/h4>\n<p style=\"text-align: center;\">Which factors really determine construction costs and building times in Mallorca \u2013 and how, from the first budget structure to the schedule, you can realistically allow for buffers and risks.<\/p>\n<h4 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/en\/project-management-construction-process-mallorca\/\">Project management and construction process<\/a><\/h4>\n<p style=\"text-align: center;\">How a reliable construction process is organised in Mallorca \u2013 from roles and responsibilities through work packages and milestones to ongoing control of costs, schedules and quality.<\/p>\n<h4 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/innenausbau-werterhalt-mallorca\/\">Interior fit-out and value retention<\/a><\/h4>\n<p style=\"text-align: center;\">How to plan interior fit-out, material choice and technical equipment so that your house in Mallorca remains usable, maintainable and valuable in the long term.<\/p>\n<h4 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/garten-wasser-aussenanlagen-mallorca\/\">Garden, water and outdoor areas<\/a><\/h4>\n<p style=\"text-align: center;\">Which topics around water, garden and outdoor areas need to be considered early so that architecture, landscape, use and technical infrastructure fit together.<\/p>\n<h4 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/en\/building-a-finca-mallorca-suelo-rustico-rules\/\">Finca and building in the countryside<\/a><\/h4>\n<p style=\"text-align: center;\">Which additional rules apply to projects in suelo r\u00fastico, how the PTIM sets the framework and what to bear in mind when developing, legalising and extending rural properties.<\/p>\n<p style=\"text-align: center;\">The legal and technical framework in Spain and the Balearics shapes this process decisively.<\/p>\n<p style=\"text-align: center;\">The \u201cLey de Ordenaci\u00f3n de la Edificaci\u00f3n\u201d (LOE) \u2013 <a href=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/LOE_deutsche_Fachuebersetzung_mit_Inhaltsangabe-jle.pdf\">here the German translation by jle (PDF)<\/a> \u2013 regulates the main actors, duties and responsibilities in the building process.<\/p>\n<p style=\"text-align: center;\">The \u201cC\u00f3digo T\u00e9cnico de la Edificaci\u00f3n\u201d (CTE) sets out the basic technical requirements for buildings. These include in particular structural and use safety, fire protection, health, energy efficiency, sound insulation and serviceability.<\/p>\n<p style=\"text-align: center;\">In the Balearics the administrative and planning framework has been developed several times since 2024. Decreto Ley 3\/2024 and Ley 7\/2024 were followed by further amendments.<\/p>\n<p style=\"text-align: center;\">Most recently, Ley 4\/2026 of 11 June 2026 introduced additional simplification instruments and again amended individual provisions of Ley 7\/2024.<\/p>\n<p style=\"text-align: center;\">Some municipalities exclude the involvement of private certification bodies for certain procedures, for example for first-occupation licences or for building projects in suelo r\u00fastico (examples: Art\u00e0, resolution of 25 May 2026; Ma\u00f3). Before commissioning an EPCU, it must therefore be clarified with the competent municipality whether this procedure is permitted.<\/p>\n<p style=\"text-align: center;\">On 30 July 2026 the Plenary of the Consell de Mallorca also adopted a resolution (BOIB No. 103\/2026) defining which activities and uses are expressly prohibited and therefore excluded from the extraordinary legalisation procedure. Before any application, it must therefore be checked whether the existing use falls under these exclusions.<\/p>\n<p style=\"text-align: center;\">Entidades colaboradoras urban\u00edsticas (ECU) are now used in practice in several municipalities.<\/p>\n<p style=\"text-align: center;\">(<a href=\"https:\/\/www.caib.es\/pidip2front\/jsp\/es\/ficha-convocatoria\/el-govern-se-reune-con-los-ayuntamientos-en-la-felib-para-informar-sobre-la-implantacion-de-las-entidades-colaboradoras-urbanisticas\" target=\"_blank\" rel=\"noopener\">FELIB ECU GOIB<\/a>).<\/p>\n<p style=\"text-align: center;\">Developing a house in Mallorca means bringing place, architecture, law, materiality and use into a reliable order. Good projects do not arise from speed but from clarity.<\/p>\n<p style=\"text-align: center;\">Anyone building in the Balearics operates in a context that demands a cool head and sensitivity: towards the authorities and their legal framework just as much as towards landscape, existing buildings, topography and, not least, the question of what should last in the long term.<\/p>\n<p style=\"text-align: center;\">Between the first idea and the finished house lie numerous decisions. The earlier they are made with precision, the more coherent the result.<\/p>\n<p style=\"text-align: center;\">In the Balearics in particular, much is decided in the early phase. Plot check, analysis of existing buildings, approval route, cost structure and team set-up are the topics that later determine quality, process and value retention.<\/p>\n<p style=\"text-align: center;\">Additional requirements apply to projects in suelo r\u00fastico. Decisive are in particular the Plan Territorial Insular de Mallorca (PTIM), municipal planning and the relevant sectoral regulations.<\/p>\n<p style=\"text-align: center;\">The current planning status must therefore be checked for each plot individually.<\/p>\n<p style=\"text-align: center;\">PTIM constellations are relevant here. (<a href=\"https:\/\/www.conselldemallorca.es\/media\/planificacioterritorial\/20230717_Text_consolidat_PTIM\/Text_consolidat_PTIM_2023_es.pdf\" target=\"_blank\" rel=\"noopener\">PTIM consolidated text (PDF)<\/a>). For more information, read our guides \u2013 <a href=\"https:\/\/jle.de\/en\/check-land-before-buying-mallorca\/\">Checking the plot and its buildability<\/a> and <a href=\"https:\/\/jle.de\/en\/building-a-finca-mallorca-suelo-rustico-rules\/\">Finca and building in the countryside<\/a>.<\/p>\n<p style=\"text-align: center;\">In practice, here as everywhere and so in Mallorca, this means: first the check. Then the strategy. Then the design.<\/p>\n<p style=\"text-align: center;\">This applies in urban areas. And it applies all the more in suelo r\u00fastico, in protected locations, in flood-related cases and for existing properties with unclear documentation. Anyone who keeps to this order plans and builds reliably.<\/p>\n<h3 style=\"text-align: center;\"><strong>Why building in Mallorca requires special preparation<\/strong><\/h3>\n<p style=\"text-align: center;\">Mallorca is not a market in which plots or existing properties can be judged by location and atmosphere alone.<\/p>\n<p style=\"text-align: center;\">The real quality of a project often depends more on land classification, servicing, protected areas, legality and the state of existing buildings than on the first impression on site.<\/p>\n<p style=\"text-align: center;\">Infrastructure is not necessarily in place. Building laws vary from municipality to municipality.<\/p>\n<p style=\"text-align: center;\">Mallorca has 53 municipalities with a building department. The planning-law situation nevertheless differs clearly from place to place.<\/p>\n<p style=\"text-align: center;\">These are not 53 independent \u201cbuilding codes\u201d.<\/p>\n<p style=\"text-align: center;\">Municipal planning instruments \u2013 in particular the Plan General, Normas Subsidiarias and detailed planning \u2013 operate within an overarching framework of Balearic planning law, the PTIM and sectoral regulations.<\/p>\n<p style=\"text-align: center;\">The age and state of updating of these municipal plans differ considerably. The Consell de Mallorca therefore also supports municipalities in updating older or outdated planning instruments.<\/p>\n<p style=\"text-align: center;\">Regional land-use plans are supra-local and overlap with local building regulations that are mostly not congruent. Internal worst-case scenarios of existing and not yet finally adopted new building regulations within the same districts can influence approval procedures.<\/p>\n<p style=\"text-align: center;\">Even a new development or general plan that is still in procedure can already affect a project.<\/p>\n<p style=\"text-align: center;\">Under Article 51 of the LUIB, in particular the aprobaci\u00f3n inicial of a new planning instrument can trigger a suspension of approval procedures and licences in the areas concerned.<\/p>\n<p style=\"text-align: center;\">During such a suspension, only projects that are compatible with both the current and the new planning status can be continued or approved.<\/p>\n<p style=\"text-align: center;\">Location alone does not make a good house. Only the interplay of buildability, legal feasibility and technical feasibility gives you security.<\/p>\n<p style=\"text-align: center;\">Only after that, in a second step, do spatial idea, choice of materials and outdoor space create the sense of inevitability that distinguishes high-quality architecture. Quality arises from context.<\/p>\n<h3 style=\"text-align: center;\"><strong>What clients should clarify before the project starts<\/strong><\/h3>\n<p style=\"text-align: center;\">Before acquiring a plot, an existing building or a project already under way, a systematic <strong>analysis of the current situation<\/strong> should therefore be carried out.<\/p>\n<p style=\"text-align: center;\">To be checked are in particular the planning-law status, the approved existing buildings, servicing and available utilities, protection and risk zones, ongoing planning procedures, any approval blocks and required sectoral opinions.<\/p>\n<p style=\"text-align: center;\">Only then can the actual legal, technical and economic feasibility be assessed reliably.<\/p>\n<h3 style=\"text-align: center;\"><strong>Questions you should ask yourself and your project partner early<\/strong><\/h3>\n<p style=\"text-align: center;\">Which use is permitted?<\/p>\n<p style=\"text-align: center;\">What technical and legal limits are there?<\/p>\n<p style=\"text-align: center;\">How can the project be structured so that in the end you have not only your own property but also a robust project?<\/p>\n<h4 style=\"text-align: center;\"><strong><a href=\"mailto:ratgeber@jle.de\">Request the guide to building in Mallorca and the Balearics<\/a><\/strong><\/h4>\n<p style=\"text-align: center;\">or<\/p>\n<h3 style=\"text-align: center;\"><a href=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/jle_checkliste_final_mobile_pdf_v22.html\"><strong>create a jle online checklist<\/strong><\/a><\/h3>\n<p><a href=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/05\/jle_checkliste_final_mobile_pdf_v22.html\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-35622\" src=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-600x400.png\" alt=\"building in Mallorca and the Balearics checklist\" width=\"172\" height=\"115\" srcset=\"https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-600x400.png 600w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-640x427.png 640w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-768x512.png 768w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39-1220x813.png 1220w, https:\/\/jle.de\/wp-content\/uploads\/2026\/03\/ChatGPT-Image-19-mar-2026-17_58_39.png 1536w\" sizes=\"auto, (max-width: 172px) 100vw, 172px\" \/><\/a><\/p>\n<h3 style=\"text-align: center;\"><strong>The most important first cornerstones of project development<\/strong><\/h3>\n<p style=\"text-align: center;\"><strong>Clarify the goal<\/strong> What is to be achieved or converted? Result, benefit, quality ambition.<\/p>\n<p style=\"text-align: center;\"><strong>Define the project scope<\/strong> What is included, what is not? Services, limits, dependencies.<\/p>\n<p style=\"text-align: center;\"><strong>Identify stakeholders<\/strong> Client, decision-makers, users, authorities, specialist planners, contractors.<\/p>\n<p style=\"text-align: center;\"><strong>Assign roles and responsibility<\/strong> Who decides? Who plans? Who checks? Who delivers? Who is liable?<\/p>\n<p style=\"text-align: center;\"><strong>Check the framework conditions<\/strong> Budget, deadlines, permits, contracts, technical requirements, risks.<\/p>\n<p style=\"text-align: center;\"><strong>Set the strategy<\/strong> Choose the approach: classic, agile, phased or hybrid.<\/p>\n<p style=\"text-align: center;\"><strong>Build the project structure<\/strong> Work packages, milestones, schedule, cost structure.<\/p>\n<p style=\"text-align: center;\"><strong>Identify risks early<\/strong> Approval risks, cost risks, technical risks, interfaces, variations.<\/p>\n<p style=\"text-align: center;\"><strong>Organise communication<\/strong> Regular meetings, minutes, decision paths, reporting.<\/p>\n<p style=\"text-align: center;\"><strong>Set up control<\/strong> Ongoing monitoring of costs, schedules, quality, changes and risks.<\/p>\n<p style=\"text-align: center;\"><strong>Short formula:<\/strong> Goal \u2192 Scope \u2192 Participants \u2192 Responsibility \u2192 Strategy \u2192 Plan \u2192 Risk \u2192 Communication \u2192 Control.<\/p>\n<h2 style=\"text-align: center;\"><strong>FAQ<\/strong><\/h2>\n<h4 style=\"text-align: center;\">Do I need to involve an architect before buying a plot?<\/h4>\n<p style=\"text-align: center;\">Definitely advisable. Before buying in particular, the professional check is often most valuable, because it can prevent later wrong decisions.<\/p>\n<h4 style=\"text-align: center;\">Is building in Mallorca fundamentally more complicated than in Germany?<\/h4>\n<p style=\"text-align: center;\">Not necessarily more complicated, but different. What matters is that local rules, procedures and land classifications are properly assessed early.<\/p>\n<h4 style=\"text-align: center;\">Why is the early phase so important in Mallorca?<\/h4>\n<p style=\"text-align: center;\">Because the biggest decisions are often made here: buildability, existing buildings, servicing, protected areas and procedures often shape the project more than later design decisions.<\/p>\n<h4 style=\"text-align: center;\">Is a good design alone not enough?<\/h4>\n<p style=\"text-align: center;\">No. A good design needs a sound framework. Without legal, technical and economic clarity, even strong architecture remains vulnerable.<\/p>\n<h2 style=\"text-align: center;\"><strong>Every good house begins with a clear mind and a clearly understood place.<\/strong><\/h2>\n<p style=\"text-align: center;\">Anyone who wants to build in Mallorca should not start with ideas, but with clarity.<\/p>\n<h3 style=\"text-align: center;\"><strong><a href=\"mailto:ratgeber@jle.de\">talk to us<\/a><\/strong><\/h3>\n<p style=\"text-align: center;\"><strong>Note:<\/strong><\/p>\n<p style=\"text-align: center;\">This content serves as initial orientation and does not replace an individual legal, technical or tax review. This applies in particular to plots in suelo r\u00fastico, existing buildings, legalisation questions, protection and risk zones, and measures requiring approval.<\/p>\n<p style=\"text-align: center;\">The extraordinary legalisation of certain existing cases in suelo r\u00fastico was introduced in 2024 and subsequently transferred into Ley 7\/2024. The relevant disposici\u00f3n adicional s\u00e9ptima was then amended several times, among others by Ley 4\/2025 and most recently by Ley 4\/2026 of 11 June 2026.<\/p>\n<p style=\"text-align: center;\">Constitutional proceedings are still pending against parts of these rules. For specific projects, the current consolidated legal position and its concrete application in Mallorca and in the competent municipality must therefore always be checked.<\/p>\n<p style=\"text-align: center;\">(<a href=\"https:\/\/www.caib.es\/sites\/institutestudisautonomics\/es\/n\/ley_72024_de_11_de_diciembre_de_medidas_urgentes_de_simplificacian_y_racionalizacian_administrativas_de_las_administraciones_pablicas_de_las_illes_balears\/\" target=\"_blank\" rel=\"noopener\">Web GOIB<\/a>)<\/p>\n<p style=\"text-align: center;\">References<\/p>\n<p style=\"text-align: center;\">Ley de Ordenaci\u00f3n de la Edificaci\u00f3n <a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-1999-21567\" target=\"_blank\" rel=\"noopener\">BOE<\/a> Roles and responsibilities in the building process<\/p>\n<p style=\"text-align: center;\">C\u00f3digo T\u00e9cnico de la Edificaci\u00f3n <a href=\"https:\/\/www.boe.es\/buscar\/act.php?id=BOE-A-2006-5515\" target=\"_blank\" rel=\"noopener\">BOE<\/a> Minimum technical standards for buildings<\/p>\n<p style=\"text-align: center;\">Ley 7\/2024 <a href=\"https:\/\/www.caib.es\/sites\/institutestudisautonomics\/es\/n\/ley_72024_de_11_de_diciembre_de_medidas_urgentes_de_simplificacian_y_racionalizacian_administrativas_de_las_administraciones_pablicas_de_las_illes_balears\/\" target=\"_blank\" rel=\"noopener\">CAIB<\/a> New Balearic framework for simplification and planning<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Do I need to involve an architect before buying a plot?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Definitely advisable. Before buying in particular, the professional check is often most valuable, because it can prevent later wrong decisions.\"}},{\"@type\":\"Question\",\"name\":\"Is building in Mallorca fundamentally more complicated than in Germany?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Not necessarily more complicated, but different. What matters is that local rules, procedures and land classifications are properly assessed early.\"}},{\"@type\":\"Question\",\"name\":\"Why is the early phase so important in Mallorca?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Because the biggest decisions are often made here: buildability, existing buildings, servicing, protected areas and procedures often shape the project more than later design decisions.\"}},{\"@type\":\"Question\",\"name\":\"Is a good design alone not enough?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. A good design needs a sound framework. Without legal, technical and economic clarity, even strong architecture remains vulnerable.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Building in Mallorca and the Balearics \u2013 Guide \u2013 What Clients Need to Know Architecture begins before the design. At the start come analysis, feasibility and clarifying the substance of the task. A building project in Mallorca first needs a precise assessment of the plot or existing building, a realistic budget structure and a sound [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"footnotes":""},"class_list":["post-38612","page","type-page","status-publish","hentry"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages\/38612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/comments?post=38612"}],"version-history":[{"count":1,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages\/38612\/revisions"}],"predecessor-version":[{"id":38613,"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/pages\/38612\/revisions\/38613"}],"wp:attachment":[{"href":"https:\/\/jle.de\/en\/wp-json\/wp\/v2\/media?parent=38612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}